Completion date: August 19, 2026
Location: Billings, MT
A failed water heater caused a Category 1 water loss affecting the living room and bathroom.
Bulk water was extracted from the affected areas, and drying equipment was placed to dry the structure. Moisture readings could not be recorded because the moisture meter was not functioning; however, the drying equipment was operating as intended. The dehumidifier in the living room was removed due to low performance. The homeowner plans to use their own contractor for the reconstruction phase.