Completion date: October 22, 2026
Location: Laurel, MT
A Category 3 sewage backup occurred in the basement bathroom from the shower due to a city line issue. This was the second backup at the property and affected the basement bathroom, back hall, mechanical area, storage area under stairs, and laundry room entrance/hallway.
Our team completed monitoring of atmospheric conditions, finding readings at a normal level. We removed one large dehumidifier and one HEPA 500 air filtration device from the site. Additionally, measurements for demolition macros were taken, and initial response macros were updated to prepare for the next phases of restoration, which include surface-level disinfection, stabilization, and marking out affected areas for required demolition. The homeowner is currently awaiting a claim with the city to ensure coverage.